Formulas used
Fence bays = Σ ceil(run length / bay width or spacing)
Installed posts = fence bays + gate openings + 1
These post counts apply to a single non-empty, connected open path. A zero-length project has zero installed posts. Every shared boundary is counted once.
Sections to buy = ceil[bays × (1 + material allowance / 100)]
Loose rails follow the same allowance, multiplied by your rails-per-bay input. Panels include their framing in this budget model.
Total = sections × price + posts × price + loose rails × price + bags × price + gates/hardware budget + labor/other budget
Concrete is calculated from installed holes, minus the embedded post volume. Spare posts do not receive concrete. See concrete geometry →