takeoff tools for real projects

Know what your fence will take.

Turn a rough fence length into a practical list of panels, posts and concrete — then add your local prices for a clear project estimate.

01measure
02adjust
03buy smarter
FCL / field sheet 001REV. B
100 ft · one straight run
14installed posts
15panels to buy
30concrete bags

Example: 8 ft bays; 10% panel & concrete allowances; 10 in holes, 30 in fill, 3.5 in square posts, 0.6 cu ft/bag. Not an installation specification.

Start with the rough shape

Build your takeoff.

No hidden assumptions. Change the dimensions and local prices until the estimate resembles your actual project.

Fence materials calculator

Results update as you type. Units: feet for layout, inches for hole and post dimensions, cubic feet for concrete.

Your fence path

One connected, open path. Enter segments in order from one end to the other. Split at each corner and gate. Run lengths exclude gate openings; adjoining runs share one corner post.

feet
Material quantities
Panel mode treats framing as included; no separate rail charge.
feet per bay; use manufacturer post-to-post coverage
percent; spare materials, not extra fence bays
whole number; no holes or concrete for spares
Concrete dimensions & allowanceCurrent example: 10 in hole · 30 in fill · 0.6 cu ft/bag

Enter your planned hole dimensions, not a recommended footing size. All geometry defaults are examples. The post is assumed to occupy the full concrete depth; gravel below that depth is excluded.

inches; round, uniform holes
inches; exclude any gravel base
inches; measured size, not nominal size
inches
cubic feet per bag; use your product label
percent; applied to net volume once

Planning quantities only—not a structural design, permit check or contractor quote. Confirm spans, post types, hole dimensions and build details with your supplier and local requirements.

Your takeoff

live estimate

14 installed posts, 13 fence bays, 30 concrete bags.

14installed posts
15panels to buy
30concrete bags
Total path / fence only100 / 100 ft
Gate openings0 · 0 ft
End / corner / gate posts2 / 0 / 0
Intermediate line posts12
Posts to buy14 (0 spare)
Installed bays / spare sections13 / 2
Separate rails to buy0 · included in panels
Concrete holes14 · installed posts only
Concrete volume + allowance17.72 cu ft

Per-segment check

Segments, lengths and fence bays
SegmentLengthBays
1 · Fence100 ft13

Shared corner and gate-boundary posts are counted once. This is an open path, not a closed loop, branching layout or disconnected set of fences. Different corner/gate post specifications may affect the quote.

Each run is rounded up separately. This assumes the final bay can be sized to fit; confirm whether your panel can be cut or requires a custom size. No picket, fastener or footing design is inferred.

See the formulas & worked example ↓
Choose your field sheet

One project, four useful views.

Start broad, then open the calculator that matches the question you need to answer on site.

A calmer way to buy

From tape measure to cart.

01 / MEASURE

Describe the run

Enter each fence run and gate opening in order. Split the path at every corner.

02 / TUNE

Use real prices

Swap in the prices from your local store, supplier quote or existing material list.

03 / CHECK

See the risk

Check the formulas, concrete dimensions and excluded costs before you commit to a purchase.

Before you buy

Common questions.

How accurate is this fence calculator?

It is a planning estimate based on the dimensions, spacing, product sizes and prices you enter. Verify the final takeoff with your supplier or installer, especially for slopes, corners, gates and local code.

How many posts do I need for a fence?

For a single connected open path, count each run separately, then use fence bays + gate openings + 1. Corner and gate-boundary posts are shared, not added twice. Spare posts are a separate purchase quantity.

How much concrete goes around each fence post?

The calculator uses round hole volume minus actual post volume, multiplied by the installed hole count. Enter fill depth, actual post dimensions and product bag yield; allowance is applied once. Defaults are examples, not footing recommendations.

Can I use my local material prices?

Yes. The cost calculator keeps prices editable so your estimate can use the quote from your local store or contractor.

Check the arithmetic

How to calculate fence materials

Make a takeoff from the actual path rather than one combined length. Each corner starts a new run; a gate is a separate opening, not a panel.

Formulas used

Fence bays = Σ ceil(run length / bay width or spacing)

Installed posts = fence bays + gate openings + 1

These post counts apply to a single non-empty, connected open path. A zero-length project has zero installed posts. Every shared boundary is counted once.

Sections to buy = ceil[bays × (1 + material allowance / 100)]

Loose rails follow the same allowance, multiplied by your rails-per-bay input. Panels include their framing in this budget model.

Concrete is calculated from installed holes, minus the embedded post volume. Spare posts do not receive concrete. See concrete geometry →

Worked example · not a quote or design

100 ft straight fence

One 100 ft straight run at 8 ft installed bay coverage needs 13 bays and 14 installed posts. With a 10% material allowance, buy 15 panels. No extra rails are charged in prefabricated-panel mode. Spare posts are a separate purchase input.

Try the inputs above ↑

Before you order materials

  • Use installed post-to-post bay coverage from the product layout, not just the visible panel width.
  • This estimator assumes the last bay can be fitted to the remaining length. Some products require a custom panel rather than cutting.
  • Separate-infill mode budgets one infill section per bay plus the rails you specify. It is not a picket, screw or bracket counter.

Scope: level, regular bays along a single connected open path; identical cylindrical holes and solid posts. No closed loops, branches, disconnected runs or structural sizing. Calculation model updated October 1, 2026.

Common questions

Understand the estimate.

Does a corner need an extra post?

A junction between two entered fence runs shares one corner post in this connected-path model. The calculator does not add a second post at that junction. Confirm whether your specific corner detail needs a different arrangement.

Does the allowance add more installed posts?

No. The percentage increases purchased panels/infill and separate rails. Enter spare posts separately; they do not create holes or increase concrete volume.